I have spent the past few weeks carting the main elements of the set over to studio three. As the actors would be stood five foot high on steel deck during the performance I wanted them to get used to the height and general elements of the set before the get in (this wednesday) I there started to bring stuff over a few weeks prior to the planned get in in the tech schedule. This gave us a chance to see the main, bare structure of the set and work out any issues way in advance. As well as Lovet's counter, table and the numerous chairs we wold be using, I also brought over five steel decks, which then became seven (as the actors needed more space on stage). This was followed by twenty eight five foot scaff poles which would raise the barber shop up, as well as the stair cases.
|
The bare layout of the set. |
I am extremely glad I decided to start bringing the set over sooner than planned in the schedule, although no major problems arose, I felt the extra time was hugely benefitially to the cast but also to me, the director and stage manager. It gave us a chance to watch runs of the show and form lists of little jobs here and there that needed to be done. Such as putting in an extra step at the top of the stairs to reach the steel deck, worrking out the mechanics of the trap door and the playing area we would lose with it in place. As well as many other issues including masking, storage, etc.
|
Steel deck in place as well as more general set. |
One aspect of the set I was extremely glad about was the fact that at the end of a run last weekend it took me only twenty minutes to put all the set into storage behind the curtain in the studio. As this is a teaching space I had imagined alot of issues arising from having to work around the teaching time table. However we had managed to transport and work with the set in the space pretty much hassle free.
Although originally supposed to be four foot tall I soon discovered that the only height we had enough scaff at was five feet. An initial concern I was glad to find that everything was still visible from the front row of the seating as we would have had no other option than to have removed the front row of seating had it proved an issue. In the end I found that once it was all in place the height of the steeel deck looked great and made for a more interesting set as there would be action going on at multiple levels in the space. After talking this over with the lighting designer we were happy with the look of the set.
The cast were happy with the set, the only thing we had yet to settle on was the trap door, which was the first thing we had designed but had gone through numerous changes over the months. These decisions were based first and foremost on safety, followed by budget. In the end it proved the simplest method was the best. As the trap door would not be in use during the first act we decided to simply use a steel deck in the space were the trap door would be placed. During the interval I would unscrew the section of steel decking from the rest and remove its two end legs, creating a slide which I would then tape a duvet too, as well as tape pillows to either leg of the opposite steel decks at the bottom of the slide. At the bottom there would be a crash mat with pillows and cushions on. Using sound effects of a trap door, as well as lightign it with birdies from the sides, we would give the impression of a trap door without actually constructing one. This would save massively on the budget, on of which I needed for the set in the end, and keep the cast more or less in one piece as they went down it.
|
One idea we had developed for the trap door was using the sheet of wood off a broken steel deck, this was replaced by the whole steel deck structure on two legs forming a slide. |
In terms of what we had established with the set so far we came across no major problems, this was made clear in the feed back from the cast and stage manager. It also gave me a valuable chance to write up a list of everything that needed to be done over the final two weeks leading up to the production week.
I first grouped all the little jobs I had left to do together, such as build jobs, paint jobs and finds. Then I re-organised these into what day I would be able to complete them, this was based on when they needed to be done by and when it would be possible to get into studio three or the uni workshop.
|
Bottles, Candle Stick Holders and Beer Tankards are a few of the props I gathered over the months. |
One of the jobs I took on but wasn't crucial for me to do was the development of a number of props. I had the bare skeleton of a set but now had to dress it to give the impression of victorian London, and not just a load of bits of furniture that seemed appropriate for the time frame. As I started months ago this gave me the chance to look around while I was out and pick up anything I might stumble across, I also went to a number of antique stores and flea markets for inspiration. I had been collecting bottles and using clay to make them look dusty and now I began to start labelling them up and filling them.
I soaked the labels in tea, glued them to the glass and allowed to dry. I then used a number of fonts to give them the victorian look. I also dripped the candle wax over their holders to make them look well used.
Finally I filled them with water mixed with food colouring and corked them up with a bunch of corks I had bought, although some of them needed trimming down as they were going into screw top bottles. As they would be quite far away from the audience this wouldn't be an issue.
|
The bottles finished. |
While in the workshop the other day I found a disgarded banister leg and decided to use it for the beadle's staff, as in rehearsals he'd been using a plain piece of dowelling and that was pretty boring. As it was square at each end I decided to sand it down with a surf form at both ends to make it smoother and more walking stick-like.
Once sanded down I found one end was hollow so filled it with builder's cork. I then started carving a head piece out of polystyrene but decided this wasn't very practical so carved one out of clay instead, as is shown below.
With the staff constructed all that was left was to stain the wod and paint the skull. I put that to one side and started to work on the sign for above Lovett's pie shop, being more crucial. As I had sketcked out the shape of the sign in hard board I decided to take it back into uni and cut it out properly with a jigsaw, as I had left cutting some of the signs out until after painting when I worked on The Visit, and it wasn't very practical.
The sign cut out I took it back home, drew out the lettering and began to paint. I played around on the computer with a rough sketck up of the sign before I chose which colours to paint it.
I decided to paint the sign green and gold, this made the lettering stand out and kept it in a style that would fit with the rest of the set.
Eventuallly the Pie symbol would be hanging from the main sign but for now I took it all into uni as the sign, like the barber's pole and wall hanging would need supports attached for hanging from the rig.
My next job was to construct an extra step for the stair case that leads form the barber shop to the pie shop, as the height between the final tread and steel decking was too high in rehearsals. I worked in the workshop on thursday morning to construct the step.
My irst job was to cut out the step/tread as well as the rises for ether side that would go down to the steel deck the stairs were placed on. Using a jigsaw I sawed up plywood and glued each piece, bracing them together while they dried and I screwed them together. With the basic structure built and connected together I began to work on the supports that would be required to hold the steps form and take the weight of people standing on it.
Running two batons of wood underneath I glued them and placed stage weights on them, while screwing the into place. I also placed a piece of plywood along the front of the step, this would give it added strength and also stop the actors from catching their feet in the gap as they went up ad down the stairs. I also ran a plank of plywood across the middle to stop the sides from bulking under weight and hold its more solid shape.
Finally I painted the whole structure black once the supports were fixed in place.
|
The step held down with stage weights. |
|
The finished step with supports in place ready for painting. |